DELIVERABLES


Some deliverables which are updated every year will appear in the following list with an index to match the consortium life.
Deliverables are either reports (downloadable files ) R or Prototypes P

Dissemination Level : All deliverables, except public ones, require an internal access.
PU = Public (downloadable files)
RE = Restricted to a group specified by the consortium
CO = Confidential (only open to consortium participants)


Deliverable No. Deliverable name Nature Level
D1-1 Kick off meeting of the consortium R CO
D2 MEMS atomic clock specifications R CO
D3 Laser specifications R CO
D4 Electronic specifications R CO
D5 Review and selection of the clock scheme R CO
D6 Detailed spec report R CO
D7-1 MAC-TFC flyer R PU
D7-2 Updated version of MAC-TFC flyer R PU
D8-1 MAC-TFC web site (updated each 6 months) R PU
D9 Evaluation of power budget R RE
D10-1 Intermediate 6-month meeting of MST (updated each 12 months) R CO
D11 Packaging & Integration R CO
D12 Testing strategy R RE
D13 First getters P RE
D14 Design of a modular experimental clock R CO
D15 Plan of thepackaging steps with risk analysis R CO
D16 First mini pills P PU
D17 Report on atomic clock magnetic behaviour R CO
D18 Reports on networking and communication actions R PU
D19-1 12-month meetings of the EMT (updated each 12 months) R RE
D1-2 First Year meeting of the consortium R CO
D8-2 MAC-TFC web site (first updating) R PU
D20 Design and test report of the ASIC R, P CO
D21 Design and test report of the RF sub-system R, P CO
D22 Report on internal parameters of cell atmosphere R CO
D23 Optimised clock scheme R CO
D24 Report on optimization of the key-steps, technological path-way of fabrication of cells R CO
D25 First generation VCSELs delivered P PU
D10-2 Second intermediate meeting of MST R CO
D8-3 MAC-TFC web site (seconde updating) R PU
D26 Report on Getter film R CO
D27 Report on mini-pills R RE
D28 Report on technology and construction of cells R+P CO
D29 Report on fabrication of passive optical elements R CO
D30 Design documents for packaging and integration R CO
D31 Test reports of the individual proof-of principle building block R CO
D32 Start of the Packaging P CO
D33 Results of the cell metrology R RE
D34 Report on fabrication of cells R CO
D35 Design and test report of the base-band and regulation sub-systems R, P CO
D36 Technological know-how, cells to be applied in the clock R CO
D37 Second generation VCSELs delivered P PU
D38 Report on optimised VCSELs R CO
D39 Reports on networking and communication actions R PU
D40 Market analysis and SWOT brochure R RE
D41 Plan for Using and Disseminating Knowledge R CO
D1-3 Second Year meeting of the consortium R CO
D8-4 MAC-TFC web site (third updating) R PU
D19-2 Second meeting of the EMT (third updating) R RE
D42 Characterization report of the entire electronics R CO
D43 First samples of Cs dispenser R CO
D44 Fabricated demonstrator modules and test reports P+R CO
D45 Third generation VCSELs delivered P PU
D46 Design and test report of the ASIC second version R, P CO
D10-3 Third intermediate meeting of MST R CO
D8-5 MAC-TFC web site (fourth updating) R PU
D47 Micro-clock fabrication process flow and manufacturability report R CO
D48 Report on wafer level thick film Cs dispenser R CO
D49 Characterization report of the entire electronics R CO
D50 Miniature clock prototype P CO
D51 Delivery of microcells P CO
D52 Test results of the clock prototype, including reliability test analysis R CO
D53 Tests results of key components R CO
D54 Magnetometer characterisations R CO
D55 Reports on networking and communication actions R PU
D56 Market analysis and SWOT brochure R RE
D57 Exploitation plan R CO
D58 Alternative Demonstrator of PP : architecture, assembly and tests R CO
D1-4 Final meeting of the consortium R CO
D8-6 MAC-TFC web site final updating R PU
www.moonchild.fr